Bonded Warehouse : mid term reflection

12.12.2018 For the end of the semester, I presented a drop displaying the concept I am working on for the Bonded Warehouse, as well as inspiration and mapping concepts. I have agreed with my lecturers to reduce the space I am working on : instead of trying to design the entire building, which is 2,000 … Continue reading Bonded Warehouse : mid term reflection

Bonded Warehouse : Concept

25.10.2018 Midway through the semester, here is an update of the Bounded Warehouse project. It includes creating arcades on both sides of the ground floor, and remove the doors, to have interior warehouses connecting with the exterior space, with pop-up shops and caf├ęs punctuating the length of the building, as well as a reception and … Continue reading Bonded Warehouse : Concept

The Bonded Warehouse on a sunny day

01.10.2018 I recently went to the Bonded Warehouse, to examine the surroundings and take pictures. It was a very sunny day, and it revealed the building's potential as a social centre in Cork. Indeed, the Bonded warehouse is a center point between the city centre and the docklands development master plan, which aims to redevelop … Continue reading The Bonded Warehouse on a sunny day

Communities : major 4th year design project

14.08.2018 Fourth year in CIT involves a year-long project, which has to be thoroughly developed throughout both semesters, associated with in-depth research and detailed results. This section of my portfolio will be dedicated to displaying my researches and progress during the semesters. The 2018/19 theme is about communities. I will rehabilitate a building into a … Continue reading Communities : major 4th year design project